location:全国
training background
the new version of gb / t 19001-2016 "quality management system requirements", the new version of gb / t 24001-2016 "environmental management system requirements" after the completion of the replacement work, the construction enterprises ushered in the new version of gb / t 50430-2017 "engineering construction enterprise quality management specifications" released, and has been officially implemented on january 1,2018.
training object
the person in charge of the construction enterprise, management representative, three chief engineer, project leader, head of the technology and quality, safety, human resources department, head of the quality management department, document writing personnel, internal auditor, etc.
training income
familiar with and understand the key points and difficulties of the quality management system standards of engineering construction enterprises;
fully grasp the relevant requirements of gb / t 50430-2017, and effectively conduct the system internal audit work;
it is conducive to eliminating the technical barriers in international trade and obtaining the "pass" to enter the international market;
can improve and standardize the enterprise internal work process and system;
increase the visibility of the enterprise, improve the quality level of the project, so that the enterprise can obtain greater economic benefits.
training outline
announcement of cnca no.21,2010
gb / t 50430 content requirements and key points
(1) general description
(2) contents and notes of the code
1. general provisions
2. terms
3. basic provisions
4. organization and responsibilities
5. human resource management
6. bidding and contract management
7. management of construction machines, tools and facilities
8. management of engineering materials, components and equipment
9. subcontracting management
10. project quality management
11. construction quality inspection and verification
12. quality management inspection, analysis, evaluation and improvement
gb / t 50430 internal review
(i) gb / t 19011-2013 management system audit guide standard
(2) overview of the management system review and related terms
(3) management of the internal audit plan
(4) start of the audit
(5) preparation of audit activities
(6) implementation of audit activities
(7) the preparation, approval and distribution of the audit report, and the audit is completed
(8) review the implementation of follow-up activities
tel: 86-400 821 5138
fax: 86-21 3327 5843
email:noa@noagroup.com